1. Sendje hydroelectric power station. Equatorial Guinea. (2015-2016, 2018-2020, 2024-present)
My core functions - planning of construction works and reporting, development of monthly certificates of completed work and their defense before the Customer (Ministry), methodological guidance on the development of documentation for internal and external reporting (including as-built documentation)
Main features:
Power - 200 MW, Budget 630 million Euro
Components of Hydroelectric Power Plant:
80m high dam, the concrete volume of 350 000 m3
![]() 2024 | ![]() 2020 | ![]() |
---|---|---|
![]() 2020 | ![]() 2015 |
HPP's main building and pressure pipelines (3000 tons of metal)
![]() 2024 | ![]() | ![]() |
---|---|---|
![]() 2020 |
Earthen dams 5 pieces (volume of the body is more than 800 000 m3), inlet and outlet channels (volume of excavation, explosions is more than million m3)
![]() | ![]() | ![]() |
---|
2. Construction/Rehabilitation Work of Kindergartens in Chernihiv City, Ukraine
Construction/Rehabilitation Work of Kindergartens in Chernihiv City, which were damaged during the russian military attack on the northern part of Ukraine
Construction Engineer of PEACE WINDS JAPAN, https://peace-winds.org
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() |
3. Construction (2 units) and reconstruction (24 units) of buildings Administrative Service Centers (ASCs) under the U-Lead program (2017-2018)
My core functions - construction management (including management of design and construction contractors, preparation of tenders). For the first time in Ukraine, we used a new construction solution used light structures(sip panels) in administrative buildings
Main features:
26 buildings of 200 m2 on average for 1.5 years (permits, development of project documentation, construction, commissioning)
2 new buildings (Polonne - Khmelnytsky region, Mykolaivka - Sumy region) used revolutionary technology for admin. buildings in Ukraine - light buildings from SIP panels with energy-saving technologies, including heat pumps, recuperation, etc.
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
4. Construction of a 31-storey premium residential complex in the center of Kyiv, with a total area of over 145,000 sq.m. (2018) - Taryan Towers
My core functions - project management, construction planning and reporting and contractor management.
![]() | ![]() |
---|
5. Chernobyl nuclear power plant. Construction of a complex for the processing of solid radioactive waste - plant and storage



6. Construction of border crossing complexes under the TACIS program - Chop, Rava-Ruska, access road Yagodin, Bagrationovsk



7. Development of design documentation for a combined cycle gas turbine power plant in the Aveva PDMS system with a BIM model
My core functions -
head of the integrated design department. Responsibility - implementation and use of Aveva PDMS 3D design system, implementation of project management based on MS Project, Primavera.
Basic project data:
Power - 2x151 MW
Each power unit includes the following economical gas and steam turbine equipment:
• Gas turbine, gas compressor, steam turbine, generator (all - Mitsublshi, Japan);
• Waste-heat boiler manufactured according to the design of the company (Nooter / Eriksen, USA);
• Steam turbine condenser (UBA, USA) .
Secondary gases of metallurgical production are used as fuel - a mixture of low-calorie blast-furnace and converter gases enriched by adding coke oven gas